Report from Lac du Koba #1

Report #1

It’s been a tough couple of days for the team. The trip from Conakry to Lac de Koba took longer than planned, but five stations are now on the air.

  • Two HEX beams are operational.
  • 60 m vertical is operational.
  • 30 m phased verticals are operational.
  • 40 m four-square has an issue we’re working on.
  • 80 m vertical is scheduled for tomorrow.
  • 160 m vertical is scheduled for tomorrow.
  • 6 m beam is scheduled for tomorrow.

We’re aware of a network issue that’s preventing some QSOs from appearing in Club Log Live Stream. If you’ve already worked us and your QSO is missing from the live stream, please wait for the daily log upload before calling us again. We’ll upload the full log to Club Log every day.

Thanks for your patience, and see you on the bands!